
LocationChaoyang New Town, Nanchang
Main transformation2 x 63 MVA
110kV connectionTwo outgoing intervals
Recorded timingCommissioning, Dec 2025
Project context.
This public project record covers the Jiuzhou (Yunfei) 110kV substation in Chaoyang New Town, Xihu District, Nanchang. The indoor station is documented through equipment, transformer and station-perimeter field photographs.
Project evidence
Selected field images from the available project record.



Discuss a similar requirement.
Send a drawing, BOM, voltage level or technical specification for an initial review.
Start an Enquiry