Buzz | Project Solutions Engineer+86 183 7066 5235
Bella | Solution Engineer+86 136 9956 4381sales@jinkaite.com
110kV tower and cable terminal infrastructure on the Jinyuan line project in Nanchang
Project archive

China / Nanchang Economic Zone

Nanchang Panlongshan–Lehua Loop-in Jinyuan 110kV Line Project

110kV
LocationNanchang Economic Zone
Route formatOverhead + cable
Recorded routes1.985 km / 1.905 km
Recorded timingOperating, Apr 2026

Project context.

This public project record covers the Panlongshan–Lehua loop-in connection to Jinyuan 110kV substation in Nanchang Economic and Technological Development Zone. The route combines overhead construction with cable sections in an urban infrastructure setting.

Project evidence

Selected field images from the available project record.

Nanchang Panlongshan–Lehua Loop-in Jinyuan 110kV Line Project field record 1
Route corridor
Nanchang Panlongshan–Lehua Loop-in Jinyuan 110kV Line Project field record 2
110kV tower structure
Nanchang Panlongshan–Lehua Loop-in Jinyuan 110kV Line Project field record 3
Tower connection detail
Nanchang Panlongshan–Lehua Loop-in Jinyuan 110kV Line Project field record 4
Overhead line environment

Discuss a similar requirement.

Send a drawing, BOM, voltage level or technical specification for an initial review.

Start an enquiry